{"id":10545,"date":"2024-12-05T08:27:28","date_gmt":"2024-12-05T07:27:28","guid":{"rendered":"https:\/\/depenbrock.dk\/replacement-of-demagnetisation-facility\/"},"modified":"2024-12-05T08:27:28","modified_gmt":"2024-12-05T07:27:28","slug":"replacement-of-demagnetisation-facility","status":"publish","type":"post","link":"https:\/\/depenbrock.dk\/en\/replacement-of-demagnetisation-facility\/","title":{"rendered":"Replacement of demagnetisation facility"},"content":{"rendered":"<div class=\"ti-project-description\">\n<p>On 7 November 2012 the water construction engineering division of Bilfinger Construction GmbH was part of a bidding consortium (partners: F+Z Baugesellschaft mbH, TGF, 55%, Aug. Prien und Tiefbau GmbH Unterweser) which was awarded the contract for the construction of the submarine demagnetisation facility in Kiel-Friedrichsort. The contract was for a secondary proposal.<\/p>\n<p>The new plant was to provide magnetic measurement, demagnetisation, measurement and adjustment of ferro-magnetic ships (submarines) up to 180 m in length, 25 m in width and with a draught of up to 9 m. The newly constructed demagnetization facility is to be approx. 300 m from the shore. The water depth here is between 10 and 13 m. The exterior dimensions of the plant are approx. 90 x 250 m (approx. 22,500 m2).<br \/>\nIn return, the existing facility which is no longer large enough must be demolished and removed. \u00a0 The ship units to be measured will either be towed over the demagnetization plant or will move into position under their own power. In the simulation of roll measurements, the units must be tied in place above the plant. The necessary fastening systems for this purpose must be provided.<br \/>\nThe technical measurement and simulation features in the simulator consist of a coil system and two rows of probe sensors. The necessary energy supply systems are part of the contract. The laying of the cables (under water) will be the subject of a later tender process. \u00a0 Consortium with Aug. Prien und Tiefbau GmbH Unterweser.<\/p>\n<p>Employer: WSA L\u00fcbeck<br \/>\nonstruction Period: 2012-2020<br \/>\nNew construction: Displacement bore piles \u000b\u00d8 85 with integrated prefabricated \u000bconcrete parts 40\/40 cm ~7,500m In-situ concr. piles \u00d8 76 cm ~ 1,030m GRP reinforcements ~ 56t Fastenings ~ 28t \u000b(a-magnetic) PE cable ducts ~ 3,950m Steel tubes as aux. piles ~ 500 t Basralocus wooden piles ~ 280m3 50\/50 cm Sawn timber ~ 450m3 Basralocus\/Bongossi\/oak HDPE pipes ~ 480m Fastening cables ~ 1,000m Demolition: Wood from underwater foundings ~ 655T PE ducts ~ 500m E cables \u00d820 mm ~ 24,000m\n<\/p><\/div>\n<div class=\"ti-project-buildingcosts\"><strong>Buildingcosts:<\/strong>\u00a0~26,8 \u20ac Mio.<\/div>\n<div class=\"ti-project-location\"><strong>Location:<\/strong>\u00a0Kiel-Friedrichsort<\/div>\n<div class=\"ti-project-pdf\"><a href=\"https:\/\/www.depenbrock.dk\/fileadmin-fzbau\/user_upload\/03_Referenzen\/Entmagnetisieranlage_Kiel\/2020_eng_Replacement_of_demagnetisation_facility_Kiel_F_Z.pdf\" target=\"_blank\" rel=\"noopener\">Download Projectsheet as PDF<\/a><\/div>\n","protected":false},"excerpt":{"rendered":"<p>On 7 November 2012 the water construction engineering division of Bilfinger Construction GmbH was part of a bidding consortium (partners: F+Z Baugesellschaft mbH, TGF, 55%, Aug. Prien und Tiefbau GmbH Unterweser) which was awarded the contract for the construction of the submarine demagnetisation facility in Kiel-Friedrichsort. The contract was for a secondary proposal. The new &#8230; <a title=\"Replacement of demagnetisation facility\" class=\"read-more\" href=\"https:\/\/depenbrock.dk\/en\/replacement-of-demagnetisation-facility\/\" aria-label=\"Read more about Replacement of demagnetisation facility\">Read more<\/a><\/p>\n","protected":false},"author":5,"featured_media":10406,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[85],"tags":[],"class_list":["post-10545","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-construction-work"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.4 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Replacement of demagnetisation facility | Depenbrock Scandinavia ApS<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/depenbrock.dk\/en\/replacement-of-demagnetisation-facility\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Replacement of demagnetisation facility | Depenbrock Scandinavia ApS\" \/>\n<meta property=\"og:description\" content=\"On 7 November 2012 the water construction engineering division of Bilfinger Construction GmbH was part of a bidding consortium (partners: F+Z Baugesellschaft mbH, TGF, 55%, Aug. Prien und Tiefbau GmbH Unterweser) which was awarded the contract for the construction of the submarine demagnetisation facility in Kiel-Friedrichsort. The contract was for a secondary proposal. The new ... Read more\" \/>\n<meta property=\"og:url\" content=\"https:\/\/depenbrock.dk\/en\/replacement-of-demagnetisation-facility\/\" \/>\n<meta property=\"og:site_name\" content=\"Depenbrock Scandinavia ApS\" \/>\n<meta property=\"article:published_time\" content=\"2024-12-05T07:27:28+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/depenbrock.dk\/wp-content\/uploads\/2024\/12\/demagnetisation_facility_kiel.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"384\" \/>\n\t<meta property=\"og:image:height\" content=\"432\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Admin\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Admin\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/depenbrock.dk\\\/en\\\/replacement-of-demagnetisation-facility\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/depenbrock.dk\\\/en\\\/replacement-of-demagnetisation-facility\\\/\"},\"author\":{\"name\":\"Admin\",\"@id\":\"https:\\\/\\\/depenbrock.dk\\\/en\\\/#\\\/schema\\\/person\\\/40acdf177c0ddd4b558a4ef84d71c31b\"},\"headline\":\"Replacement of demagnetisation facility\",\"datePublished\":\"2024-12-05T07:27:28+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/depenbrock.dk\\\/en\\\/replacement-of-demagnetisation-facility\\\/\"},\"wordCount\":317,\"publisher\":{\"@id\":\"https:\\\/\\\/depenbrock.dk\\\/en\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/depenbrock.dk\\\/en\\\/replacement-of-demagnetisation-facility\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/depenbrock.dk\\\/wp-content\\\/uploads\\\/2024\\\/12\\\/demagnetisation_facility_kiel.jpg\",\"articleSection\":[\"Construction work\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/depenbrock.dk\\\/en\\\/replacement-of-demagnetisation-facility\\\/\",\"url\":\"https:\\\/\\\/depenbrock.dk\\\/en\\\/replacement-of-demagnetisation-facility\\\/\",\"name\":\"Replacement of demagnetisation facility | Depenbrock Scandinavia ApS\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/depenbrock.dk\\\/en\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/depenbrock.dk\\\/en\\\/replacement-of-demagnetisation-facility\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/depenbrock.dk\\\/en\\\/replacement-of-demagnetisation-facility\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/depenbrock.dk\\\/wp-content\\\/uploads\\\/2024\\\/12\\\/demagnetisation_facility_kiel.jpg\",\"datePublished\":\"2024-12-05T07:27:28+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/depenbrock.dk\\\/en\\\/replacement-of-demagnetisation-facility\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/depenbrock.dk\\\/en\\\/replacement-of-demagnetisation-facility\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/depenbrock.dk\\\/en\\\/replacement-of-demagnetisation-facility\\\/#primaryimage\",\"url\":\"https:\\\/\\\/depenbrock.dk\\\/wp-content\\\/uploads\\\/2024\\\/12\\\/demagnetisation_facility_kiel.jpg\",\"contentUrl\":\"https:\\\/\\\/depenbrock.dk\\\/wp-content\\\/uploads\\\/2024\\\/12\\\/demagnetisation_facility_kiel.jpg\",\"width\":384,\"height\":432},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/depenbrock.dk\\\/en\\\/replacement-of-demagnetisation-facility\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Forside\",\"item\":\"https:\\\/\\\/depenbrock.dk\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Replacement of demagnetisation facility\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/depenbrock.dk\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/depenbrock.dk\\\/en\\\/\",\"name\":\"Depenbrock Scandinavia ApS\",\"description\":\"DEPENBROCK SCANDINAVIA - FRA STORE HAVNE TIL INFRASTRUKTURELLE BROL\u00d8SNINGER\",\"publisher\":{\"@id\":\"https:\\\/\\\/depenbrock.dk\\\/en\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/depenbrock.dk\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/depenbrock.dk\\\/en\\\/#organization\",\"name\":\"Depenbrock Scandinavia ApS\",\"url\":\"https:\\\/\\\/depenbrock.dk\\\/en\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/depenbrock.dk\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/depenbrock.dk\\\/wp-content\\\/uploads\\\/2024\\\/11\\\/DB-scan.svg\",\"contentUrl\":\"https:\\\/\\\/depenbrock.dk\\\/wp-content\\\/uploads\\\/2024\\\/11\\\/DB-scan.svg\",\"width\":195,\"height\":40,\"caption\":\"Depenbrock Scandinavia ApS\"},\"image\":{\"@id\":\"https:\\\/\\\/depenbrock.dk\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/depenbrock.dk\\\/en\\\/#\\\/schema\\\/person\\\/40acdf177c0ddd4b558a4ef84d71c31b\",\"name\":\"Admin\",\"url\":\"https:\\\/\\\/depenbrock.dk\\\/en\\\/author\\\/admin\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Replacement of demagnetisation facility | Depenbrock Scandinavia ApS","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/depenbrock.dk\/en\/replacement-of-demagnetisation-facility\/","og_locale":"en_US","og_type":"article","og_title":"Replacement of demagnetisation facility | Depenbrock Scandinavia ApS","og_description":"On 7 November 2012 the water construction engineering division of Bilfinger Construction GmbH was part of a bidding consortium (partners: F+Z Baugesellschaft mbH, TGF, 55%, Aug. Prien und Tiefbau GmbH Unterweser) which was awarded the contract for the construction of the submarine demagnetisation facility in Kiel-Friedrichsort. The contract was for a secondary proposal. The new ... Read more","og_url":"https:\/\/depenbrock.dk\/en\/replacement-of-demagnetisation-facility\/","og_site_name":"Depenbrock Scandinavia ApS","article_published_time":"2024-12-05T07:27:28+00:00","og_image":[{"width":384,"height":432,"url":"https:\/\/depenbrock.dk\/wp-content\/uploads\/2024\/12\/demagnetisation_facility_kiel.jpg","type":"image\/jpeg"}],"author":"Admin","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Admin","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/depenbrock.dk\/en\/replacement-of-demagnetisation-facility\/#article","isPartOf":{"@id":"https:\/\/depenbrock.dk\/en\/replacement-of-demagnetisation-facility\/"},"author":{"name":"Admin","@id":"https:\/\/depenbrock.dk\/en\/#\/schema\/person\/40acdf177c0ddd4b558a4ef84d71c31b"},"headline":"Replacement of demagnetisation facility","datePublished":"2024-12-05T07:27:28+00:00","mainEntityOfPage":{"@id":"https:\/\/depenbrock.dk\/en\/replacement-of-demagnetisation-facility\/"},"wordCount":317,"publisher":{"@id":"https:\/\/depenbrock.dk\/en\/#organization"},"image":{"@id":"https:\/\/depenbrock.dk\/en\/replacement-of-demagnetisation-facility\/#primaryimage"},"thumbnailUrl":"https:\/\/depenbrock.dk\/wp-content\/uploads\/2024\/12\/demagnetisation_facility_kiel.jpg","articleSection":["Construction work"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/depenbrock.dk\/en\/replacement-of-demagnetisation-facility\/","url":"https:\/\/depenbrock.dk\/en\/replacement-of-demagnetisation-facility\/","name":"Replacement of demagnetisation facility | Depenbrock Scandinavia ApS","isPartOf":{"@id":"https:\/\/depenbrock.dk\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/depenbrock.dk\/en\/replacement-of-demagnetisation-facility\/#primaryimage"},"image":{"@id":"https:\/\/depenbrock.dk\/en\/replacement-of-demagnetisation-facility\/#primaryimage"},"thumbnailUrl":"https:\/\/depenbrock.dk\/wp-content\/uploads\/2024\/12\/demagnetisation_facility_kiel.jpg","datePublished":"2024-12-05T07:27:28+00:00","breadcrumb":{"@id":"https:\/\/depenbrock.dk\/en\/replacement-of-demagnetisation-facility\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/depenbrock.dk\/en\/replacement-of-demagnetisation-facility\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/depenbrock.dk\/en\/replacement-of-demagnetisation-facility\/#primaryimage","url":"https:\/\/depenbrock.dk\/wp-content\/uploads\/2024\/12\/demagnetisation_facility_kiel.jpg","contentUrl":"https:\/\/depenbrock.dk\/wp-content\/uploads\/2024\/12\/demagnetisation_facility_kiel.jpg","width":384,"height":432},{"@type":"BreadcrumbList","@id":"https:\/\/depenbrock.dk\/en\/replacement-of-demagnetisation-facility\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Forside","item":"https:\/\/depenbrock.dk\/en\/"},{"@type":"ListItem","position":2,"name":"Replacement of demagnetisation facility"}]},{"@type":"WebSite","@id":"https:\/\/depenbrock.dk\/en\/#website","url":"https:\/\/depenbrock.dk\/en\/","name":"Depenbrock Scandinavia ApS","description":"DEPENBROCK SCANDINAVIA - FRA STORE HAVNE TIL INFRASTRUKTURELLE BROL\u00d8SNINGER","publisher":{"@id":"https:\/\/depenbrock.dk\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/depenbrock.dk\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/depenbrock.dk\/en\/#organization","name":"Depenbrock Scandinavia ApS","url":"https:\/\/depenbrock.dk\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/depenbrock.dk\/en\/#\/schema\/logo\/image\/","url":"https:\/\/depenbrock.dk\/wp-content\/uploads\/2024\/11\/DB-scan.svg","contentUrl":"https:\/\/depenbrock.dk\/wp-content\/uploads\/2024\/11\/DB-scan.svg","width":195,"height":40,"caption":"Depenbrock Scandinavia ApS"},"image":{"@id":"https:\/\/depenbrock.dk\/en\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/depenbrock.dk\/en\/#\/schema\/person\/40acdf177c0ddd4b558a4ef84d71c31b","name":"Admin","url":"https:\/\/depenbrock.dk\/en\/author\/admin\/"}]}},"_links":{"self":[{"href":"https:\/\/depenbrock.dk\/en\/wp-json\/wp\/v2\/posts\/10545","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/depenbrock.dk\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/depenbrock.dk\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/depenbrock.dk\/en\/wp-json\/wp\/v2\/users\/5"}],"replies":[{"embeddable":true,"href":"https:\/\/depenbrock.dk\/en\/wp-json\/wp\/v2\/comments?post=10545"}],"version-history":[{"count":0,"href":"https:\/\/depenbrock.dk\/en\/wp-json\/wp\/v2\/posts\/10545\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/depenbrock.dk\/en\/wp-json\/wp\/v2\/media\/10406"}],"wp:attachment":[{"href":"https:\/\/depenbrock.dk\/en\/wp-json\/wp\/v2\/media?parent=10545"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/depenbrock.dk\/en\/wp-json\/wp\/v2\/categories?post=10545"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/depenbrock.dk\/en\/wp-json\/wp\/v2\/tags?post=10545"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}