{"id":10578,"date":"2024-11-28T08:52:19","date_gmt":"2024-11-28T07:52:19","guid":{"rendered":"https:\/\/depenbrock.dk\/berth-9-offshore-base-2\/"},"modified":"2025-06-13T10:07:40","modified_gmt":"2025-06-13T08:07:40","slug":"berth-9-offshore-base-2","status":"publish","type":"post","link":"https:\/\/depenbrock.dk\/en\/berth-9-offshore-base-2\/","title":{"rendered":"Berth 9 &#8211; Offshore base"},"content":{"rendered":"<div class=\"ti-project-description\">\n<p>The order for the construction of the offshore LP 9 in Cuxhaven was generated by a joint venture of F+Z Baugesellschaft (today Depenbrock Ingenieurwasserbau), Josef M\u00f6bius, Tiefbau GmbH Unterweser and Heinrich Hirdes via a secondary bid with optimized finger pier and sheet pile wall construction. Execution took place between March 2010 and December 2012.<br \/>\nThe existing offshore base port LP 8 (see also reference projects) was thus extended by 680 m in length. The quay wall is divided into general cargo, bulk cargo and flushing berth. In addition, a finger pier was planned for the shipment of wind power foundations by means of a catamaran installation ship. In addition to the core services, consisting of pile driving and reinforced concrete work, dredging, drainage and road construction work was carried out.<br \/>\nThe challenge of this project lay above all in the demanding local subsoil conditions with deep soft layers. In cooperation with the soil expert, various test loads on the supporting elements were carried out and evaluated and concepts for the pre-consolidation of the soft layers were developed. \u00a0 After the technical office had successfully completed the implementation planning, it was carried out using its own equipment units.<\/p>\n<p>The combined sheet pile wall consisting of support tubes \u00d81420 mm with lengths of up to 30 m was anchored back with Peiner sloping piles with lengths of up to 50 m. A low-lying shielding plate was provided to relieve the sheet pile wall for the very high area loads. The foundation of the slab with 3 to 4 pile rows was carried out using in-situ concrete driven piles \u00d861 cm with lengths of up to 36 m.<\/p>\n<\/div>\n<div class=\"ti-project-buildingcosts\"><strong>Buildingcosts:<\/strong>\u00a059,7 \u20ac Mio.<\/div>\n<div class=\"ti-project-location\"><strong>Location:<\/strong>\u00a0Cuxhaven<\/div>\n<div class=\"ti-project-pdf\"><a href=\"https:\/\/depenbrock.dk\/wp-content\/uploads\/2025\/06\/2012_eng_Berth_9_Cuxhaven_FZ.pdf\" target=\"_blank\" rel=\"noopener\">Download Projectsheet as PDF<\/a><\/div>\n","protected":false},"excerpt":{"rendered":"<p>The order for the construction of the offshore LP 9 in Cuxhaven was generated by a joint venture of F+Z Baugesellschaft (today Depenbrock Ingenieurwasserbau), Josef M\u00f6bius, Tiefbau GmbH Unterweser and Heinrich Hirdes via a secondary bid with optimized finger pier and sheet pile wall construction. Execution took place between March 2010 and December 2012. The &#8230; <a title=\"Berth 9 &#8211; Offshore base\" class=\"read-more\" href=\"https:\/\/depenbrock.dk\/en\/berth-9-offshore-base-2\/\" aria-label=\"Read more about Berth 9 &#8211; Offshore base\">Read more<\/a><\/p>\n","protected":false},"author":5,"featured_media":10373,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[88],"tags":[],"class_list":["post-10578","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-fundering-paa-vandet-en"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.4 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Berth 9 - Offshore base | Depenbrock Scandinavia ApS<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/depenbrock.dk\/en\/berth-9-offshore-base-2\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Berth 9 - Offshore base | Depenbrock Scandinavia ApS\" \/>\n<meta property=\"og:description\" content=\"The order for the construction of the offshore LP 9 in Cuxhaven was generated by a joint venture of F+Z Baugesellschaft (today Depenbrock Ingenieurwasserbau), Josef M\u00f6bius, Tiefbau GmbH Unterweser and Heinrich Hirdes via a secondary bid with optimized finger pier and sheet pile wall construction. Execution took place between March 2010 and December 2012. The ... Read more\" \/>\n<meta property=\"og:url\" content=\"https:\/\/depenbrock.dk\/en\/berth-9-offshore-base-2\/\" \/>\n<meta property=\"og:site_name\" content=\"Depenbrock Scandinavia ApS\" \/>\n<meta property=\"article:published_time\" content=\"2024-11-28T07:52:19+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2025-06-13T08:07:40+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/depenbrock.dk\/wp-content\/uploads\/2024\/11\/Berth_9_Cuxhaven-1.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"456\" \/>\n\t<meta property=\"og:image:height\" content=\"275\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Admin\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Admin\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"1 minute\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/depenbrock.dk\\\/en\\\/berth-9-offshore-base-2\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/depenbrock.dk\\\/en\\\/berth-9-offshore-base-2\\\/\"},\"author\":{\"name\":\"Admin\",\"@id\":\"https:\\\/\\\/depenbrock.dk\\\/en\\\/#\\\/schema\\\/person\\\/40acdf177c0ddd4b558a4ef84d71c31b\"},\"headline\":\"Berth 9 &#8211; Offshore base\",\"datePublished\":\"2024-11-28T07:52:19+00:00\",\"dateModified\":\"2025-06-13T08:07:40+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/depenbrock.dk\\\/en\\\/berth-9-offshore-base-2\\\/\"},\"wordCount\":276,\"publisher\":{\"@id\":\"https:\\\/\\\/depenbrock.dk\\\/en\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/depenbrock.dk\\\/en\\\/berth-9-offshore-base-2\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/depenbrock.dk\\\/wp-content\\\/uploads\\\/2024\\\/11\\\/Berth_9_Cuxhaven-1.jpg\",\"articleSection\":[\"Fundering p\u00e5 vandet\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/depenbrock.dk\\\/en\\\/berth-9-offshore-base-2\\\/\",\"url\":\"https:\\\/\\\/depenbrock.dk\\\/en\\\/berth-9-offshore-base-2\\\/\",\"name\":\"Berth 9 - Offshore base | Depenbrock Scandinavia ApS\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/depenbrock.dk\\\/en\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/depenbrock.dk\\\/en\\\/berth-9-offshore-base-2\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/depenbrock.dk\\\/en\\\/berth-9-offshore-base-2\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/depenbrock.dk\\\/wp-content\\\/uploads\\\/2024\\\/11\\\/Berth_9_Cuxhaven-1.jpg\",\"datePublished\":\"2024-11-28T07:52:19+00:00\",\"dateModified\":\"2025-06-13T08:07:40+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/depenbrock.dk\\\/en\\\/berth-9-offshore-base-2\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/depenbrock.dk\\\/en\\\/berth-9-offshore-base-2\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/depenbrock.dk\\\/en\\\/berth-9-offshore-base-2\\\/#primaryimage\",\"url\":\"https:\\\/\\\/depenbrock.dk\\\/wp-content\\\/uploads\\\/2024\\\/11\\\/Berth_9_Cuxhaven-1.jpg\",\"contentUrl\":\"https:\\\/\\\/depenbrock.dk\\\/wp-content\\\/uploads\\\/2024\\\/11\\\/Berth_9_Cuxhaven-1.jpg\",\"width\":456,\"height\":275},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/depenbrock.dk\\\/en\\\/berth-9-offshore-base-2\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Forside\",\"item\":\"https:\\\/\\\/depenbrock.dk\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Berth 9 &#8211; Offshore base\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/depenbrock.dk\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/depenbrock.dk\\\/en\\\/\",\"name\":\"Depenbrock Scandinavia ApS\",\"description\":\"DEPENBROCK SCANDINAVIA - FRA STORE HAVNE TIL INFRASTRUKTURELLE BROL\u00d8SNINGER\",\"publisher\":{\"@id\":\"https:\\\/\\\/depenbrock.dk\\\/en\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/depenbrock.dk\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/depenbrock.dk\\\/en\\\/#organization\",\"name\":\"Depenbrock Scandinavia ApS\",\"url\":\"https:\\\/\\\/depenbrock.dk\\\/en\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/depenbrock.dk\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/depenbrock.dk\\\/wp-content\\\/uploads\\\/2024\\\/11\\\/DB-scan.svg\",\"contentUrl\":\"https:\\\/\\\/depenbrock.dk\\\/wp-content\\\/uploads\\\/2024\\\/11\\\/DB-scan.svg\",\"width\":195,\"height\":40,\"caption\":\"Depenbrock Scandinavia ApS\"},\"image\":{\"@id\":\"https:\\\/\\\/depenbrock.dk\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/depenbrock.dk\\\/en\\\/#\\\/schema\\\/person\\\/40acdf177c0ddd4b558a4ef84d71c31b\",\"name\":\"Admin\",\"url\":\"https:\\\/\\\/depenbrock.dk\\\/en\\\/author\\\/admin\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Berth 9 - Offshore base | Depenbrock Scandinavia ApS","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/depenbrock.dk\/en\/berth-9-offshore-base-2\/","og_locale":"en_US","og_type":"article","og_title":"Berth 9 - Offshore base | Depenbrock Scandinavia ApS","og_description":"The order for the construction of the offshore LP 9 in Cuxhaven was generated by a joint venture of F+Z Baugesellschaft (today Depenbrock Ingenieurwasserbau), Josef M\u00f6bius, Tiefbau GmbH Unterweser and Heinrich Hirdes via a secondary bid with optimized finger pier and sheet pile wall construction. Execution took place between March 2010 and December 2012. The ... Read more","og_url":"https:\/\/depenbrock.dk\/en\/berth-9-offshore-base-2\/","og_site_name":"Depenbrock Scandinavia ApS","article_published_time":"2024-11-28T07:52:19+00:00","article_modified_time":"2025-06-13T08:07:40+00:00","og_image":[{"width":456,"height":275,"url":"https:\/\/depenbrock.dk\/wp-content\/uploads\/2024\/11\/Berth_9_Cuxhaven-1.jpg","type":"image\/jpeg"}],"author":"Admin","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Admin","Est. reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/depenbrock.dk\/en\/berth-9-offshore-base-2\/#article","isPartOf":{"@id":"https:\/\/depenbrock.dk\/en\/berth-9-offshore-base-2\/"},"author":{"name":"Admin","@id":"https:\/\/depenbrock.dk\/en\/#\/schema\/person\/40acdf177c0ddd4b558a4ef84d71c31b"},"headline":"Berth 9 &#8211; Offshore base","datePublished":"2024-11-28T07:52:19+00:00","dateModified":"2025-06-13T08:07:40+00:00","mainEntityOfPage":{"@id":"https:\/\/depenbrock.dk\/en\/berth-9-offshore-base-2\/"},"wordCount":276,"publisher":{"@id":"https:\/\/depenbrock.dk\/en\/#organization"},"image":{"@id":"https:\/\/depenbrock.dk\/en\/berth-9-offshore-base-2\/#primaryimage"},"thumbnailUrl":"https:\/\/depenbrock.dk\/wp-content\/uploads\/2024\/11\/Berth_9_Cuxhaven-1.jpg","articleSection":["Fundering p\u00e5 vandet"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/depenbrock.dk\/en\/berth-9-offshore-base-2\/","url":"https:\/\/depenbrock.dk\/en\/berth-9-offshore-base-2\/","name":"Berth 9 - Offshore base | Depenbrock Scandinavia ApS","isPartOf":{"@id":"https:\/\/depenbrock.dk\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/depenbrock.dk\/en\/berth-9-offshore-base-2\/#primaryimage"},"image":{"@id":"https:\/\/depenbrock.dk\/en\/berth-9-offshore-base-2\/#primaryimage"},"thumbnailUrl":"https:\/\/depenbrock.dk\/wp-content\/uploads\/2024\/11\/Berth_9_Cuxhaven-1.jpg","datePublished":"2024-11-28T07:52:19+00:00","dateModified":"2025-06-13T08:07:40+00:00","breadcrumb":{"@id":"https:\/\/depenbrock.dk\/en\/berth-9-offshore-base-2\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/depenbrock.dk\/en\/berth-9-offshore-base-2\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/depenbrock.dk\/en\/berth-9-offshore-base-2\/#primaryimage","url":"https:\/\/depenbrock.dk\/wp-content\/uploads\/2024\/11\/Berth_9_Cuxhaven-1.jpg","contentUrl":"https:\/\/depenbrock.dk\/wp-content\/uploads\/2024\/11\/Berth_9_Cuxhaven-1.jpg","width":456,"height":275},{"@type":"BreadcrumbList","@id":"https:\/\/depenbrock.dk\/en\/berth-9-offshore-base-2\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Forside","item":"https:\/\/depenbrock.dk\/en\/"},{"@type":"ListItem","position":2,"name":"Berth 9 &#8211; Offshore base"}]},{"@type":"WebSite","@id":"https:\/\/depenbrock.dk\/en\/#website","url":"https:\/\/depenbrock.dk\/en\/","name":"Depenbrock Scandinavia ApS","description":"DEPENBROCK SCANDINAVIA - FRA STORE HAVNE TIL INFRASTRUKTURELLE BROL\u00d8SNINGER","publisher":{"@id":"https:\/\/depenbrock.dk\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/depenbrock.dk\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/depenbrock.dk\/en\/#organization","name":"Depenbrock Scandinavia ApS","url":"https:\/\/depenbrock.dk\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/depenbrock.dk\/en\/#\/schema\/logo\/image\/","url":"https:\/\/depenbrock.dk\/wp-content\/uploads\/2024\/11\/DB-scan.svg","contentUrl":"https:\/\/depenbrock.dk\/wp-content\/uploads\/2024\/11\/DB-scan.svg","width":195,"height":40,"caption":"Depenbrock Scandinavia ApS"},"image":{"@id":"https:\/\/depenbrock.dk\/en\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/depenbrock.dk\/en\/#\/schema\/person\/40acdf177c0ddd4b558a4ef84d71c31b","name":"Admin","url":"https:\/\/depenbrock.dk\/en\/author\/admin\/"}]}},"_links":{"self":[{"href":"https:\/\/depenbrock.dk\/en\/wp-json\/wp\/v2\/posts\/10578","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/depenbrock.dk\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/depenbrock.dk\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/depenbrock.dk\/en\/wp-json\/wp\/v2\/users\/5"}],"replies":[{"embeddable":true,"href":"https:\/\/depenbrock.dk\/en\/wp-json\/wp\/v2\/comments?post=10578"}],"version-history":[{"count":1,"href":"https:\/\/depenbrock.dk\/en\/wp-json\/wp\/v2\/posts\/10578\/revisions"}],"predecessor-version":[{"id":10969,"href":"https:\/\/depenbrock.dk\/en\/wp-json\/wp\/v2\/posts\/10578\/revisions\/10969"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/depenbrock.dk\/en\/wp-json\/wp\/v2\/media\/10373"}],"wp:attachment":[{"href":"https:\/\/depenbrock.dk\/en\/wp-json\/wp\/v2\/media?parent=10578"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/depenbrock.dk\/en\/wp-json\/wp\/v2\/categories?post=10578"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/depenbrock.dk\/en\/wp-json\/wp\/v2\/tags?post=10578"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}