F+Z Baugesellschaft (now Depenbrock
Ingenieurwasserbau) was awarded the contract to build
the new Brunsbüttel pilot jetty. An alternative offer was
commissioned. This jetty is used by the pilots to transfer
to the pilot vehicles (“Touch-and-Go” jetty).
The tender included the construction of an access
walkway over the dike foreland, an access bridge and a
mooring pontoon.
Ingenieurwasserbau) was awarded the contract to build
the new Brunsbüttel pilot jetty. An alternative offer was
commissioned. This jetty is used by the pilots to transfer
to the pilot vehicles (“Touch-and-Go” jetty).
The tender included the construction of an access
walkway over the dike foreland, an access bridge and a
mooring pontoon.
Considering the accessibility of the jetty even at high tide
and flood levels, the jetty was planned with a height of
+8.30mNN. Via this jetty the mooring pontoon of the
Brunsbüttel pilot house can be reached flood-safe.
and flood levels, the jetty was planned with a height of
+8.30mNN. Via this jetty the mooring pontoon of the
Brunsbüttel pilot house can be reached flood-safe.
Buildingcosts: ~2,569 € Mio
Location: Elbe vor Brunsbüttel