Harbour Wyk Föhr Island

1. construction phase

Upgrading of ferry pier 1 in the port of Wyk auf Föhr.

 

Technical data / main masses:

Dolphins                         120 t

Sheet pile wall             1.200 t

Sand backfill                9.000 m³

Concrete                      1.000 m³

Surface preparation     5.000 m²

Buildingcosts: 5,8 € Mio.
Location: Wyk Föhr Island