Bramming footbridge

Footbridge over Main Road 11, Bramming, Denmark

A new cycle path is being built between St Darum and Bramming. The contract is to connect the section with a footbridge over Main Road 11. The footbridge is made of Corten steel, with epoxy coating on the roadway. Foundations, columns and anchorages are made as concrete structures.

The work will be carried out in 2023 and 2024.

Order size:
DKK 5 million.
Contractor:
Depenbrock Scandinavia ApS.
Contract:
Main Contractor.
Client:
Esbjerg Municipality.
Construction period:
01.11.2023 ––.04.2024.
Location:
Bramming, Denmark.
Technical specifications and quantities:
•Steel bridge 4m x 43m, 40 tons.
•Construction concrete: 36 m3
•Road embankment: 2150 m3
•Rerouting of various lines.

+45 31 31 76 44
info@depenbrock.dk